top of page

CONSTRUCTION UPDATES

Although Broadway Hills Estates is nearly sold out, please fill out the Contact Us for information on future subdivisions!

IMG_7745.jpg

COMPLETED!!

12-21-20

The installation of survey irons on property corners and lot line markers complete construction of Broadway Hills Estates!

IMG_8008.JPG

LET THERE BE LIGHT!

12-15-20

After testing of the new utilities was completed and passed, the utilities were energized and the previously dark field was illumiated with its new LED street lights

IMG_7747.jpg

UTILITY INSTALL

12-5-20

Light poles, transformers, power, gas and cable are installed along both sides of Snowdrift Dr

IMG_7448.JPG

UTILITY INSTALL PREP

11-15-20

Light poles, transformers and utility trenches are marked as the site is prepped for utility install

IMG_7338.JPG

SEEDING

11-9-20

Lots 1-4, 10-12, right of ways and surrounding areas are seeded as final grading is completed

IMG_7137.JPG

UTILITY PRECON WALK

10-29-20

Members from Martenson & Eisle, Michels, & @ WE Energies complete a pre-construction walk of the utility route on a bitterly cold and windy day prior to installing electric, gas and cable utilities.

IMG_7086.JPG

SNOWDRIFT ON SNOWDRIFT DR?

10-26-20

A relatively early season snow covers Snowdrift Dr and the remainder of Broadway Hills Estates as final road and lot grading near completion

IMG_7049.JPG

THE PONDS FILL QUICKLY

10-24-20

The North pond raises roughly 4' in 24 hours to its designed water level after a cold fall storm dumps nearly 3.5" of rain on NE Wisconsin

IMG_7015.JPG

NORTH POND COMPLETION

10-22-20

The North pond is brought to final grade, fertilized, seeded and covered in erosion control matting in advance of a predicted heavy fall rain

IMG_7022.JPG

A THROUGH STREET!

10-22-20

Snowdrift Dr is covered in gravel from French Rd thru to Broadway Dr for the first time!

IMG_7026.JPG

COMPLETION OF SOUTH POND

10-16-20

The South pond passes final inspection, is covered with top soil, seeded and covered in erosion control matting

IMG_6873.JPG

ROAD BUILDING

10-12-20

The road base of Snowdrift Dr is installed in front of the North pond down to lots 7-12

IMG_6644.JPG

LOT GRADING

10-10-20

Thousands of yards of fill are hauled in, spread and graded on lots 1-3

IMG_6844.JPG

LOT GRADING

10-9-20

Lots16-18 are leveled, compacted and brought to final grade

IMG_6774.JPG

MOUNTAINS OF FILL

10-7-20

Some of the 50,000+ yards of clay fill awaits grading on lots 16-18

IMG_6772.JPG

NORTH POND CONSTRUCTION

10-7-20

Construction on the North pond begins

IMG_6688.JPG

SOUTH POND CONSTRUCTION

9-30-20

South Pond main excavation is completed and ready to install clay liner

IMG_6648.JPG

SOUTH POND CONSTRUCTION

9-30-20

Bowers & Sons Construction team makes good headway digging the South Pond

IMG_6628.JPG

STARTING SOUTH POND

9-29-20

Bowers & Sons Construction pumps surface water off and makes final preparations before digging the South pond

IMG_6624.PNG

TRUCK PARADE

9-28-20

A parade of dump trucks works on French Rd hauling in 40,000+ yards of clay fill to raise the grade of Snowdrift Dr and the Southern most six lots of Broadway Hills Estates

IMG_6607.JPG

STORM SEWER INSTALL

9-28-20

Storm sewer lateral installation in thick mud heading North on the East side of Lots 16-18.

IMG_6537.JPG

STORM SEWER INSTALL

9-24-20

Storm sewer installation heading North on Snowdrift Dr in front of Lot #2.  Trucks hauling fill in the background to raise level of the road and Southern six lots.

IMG_6524.JPG

STORM SEWER INSTALL

9-23-20

Storm sewer installation on the South lot line of Lot #18 and Broadway Dr

IMG_6482.JPG

WATER MAIN INSTALLED ON SNOWDRIFT DR

9-18-20

Water main and hydrants installed along Snowdrift Drive

IMG_6430.JPG

NORTH POND AREA

9-17-20

View of the North pond. Top Soil has been stripped and ready for excavation around Oct 8th.

IMG_6437.JPG

SOUTH POND AREA/LOT #19

9-17-20

View of the South pond and part of Lot #19. Top Soil has been stripped and ready for excavation around Oct 1st.

IMG_6434.JPG

SNOWDRIFT DR

9-16-20

Snowdrift Drive has sanitary sewer installed, blue flags on the left (East) side of the road mark the water main to be installed over the next week

IMG_6400.JPG

INSTALLING SANITARY SEWER

9-15-20

Bowers & Sons employees installing sanitary sewer in front of lot #9 & 13 in Snowdrift Dr, 27' below ground!

bottom of page