CONSTRUCTION UPDATES
Although Broadway Hills Estates is nearly sold out, please fill out the Contact Us for information on future subdivisions!
COMPLETED!!
12-21-20
The installation of survey irons on property corners and lot line markers complete construction of Broadway Hills Estates!
LET THERE BE LIGHT!
12-15-20
After testing of the new utilities was completed and passed, the utilities were energized and the previously dark field was illumiated with its new LED street lights
UTILITY INSTALL
12-5-20
Light poles, transformers, power, gas and cable are installed along both sides of Snowdrift Dr
UTILITY INSTALL PREP
11-15-20
Light poles, transformers and utility trenches are marked as the site is prepped for utility install
SEEDING
11-9-20
Lots 1-4, 10-12, right of ways and surrounding areas are seeded as final grading is completed
UTILITY PRECON WALK
10-29-20
Members from Martenson & Eisle, Michels, & @ WE Energies complete a pre-construction walk of the utility route on a bitterly cold and windy day prior to installing electric, gas and cable utilities.
SNOWDRIFT ON SNOWDRIFT DR?
10-26-20
A relatively early season snow covers Snowdrift Dr and the remainder of Broadway Hills Estates as final road and lot grading near completion
THE PONDS FILL QUICKLY
10-24-20
The North pond raises roughly 4' in 24 hours to its designed water level after a cold fall storm dumps nearly 3.5" of rain on NE Wisconsin
NORTH POND COMPLETION
10-22-20
The North pond is brought to final grade, fertilized, seeded and covered in erosion control matting in advance of a predicted heavy fall rain
A THROUGH STREET!
10-22-20
Snowdrift Dr is covered in gravel from French Rd thru to Broadway Dr for the first time!
COMPLETION OF SOUTH POND
10-16-20
The South pond passes final inspection, is covered with top soil, seeded and covered in erosion control matting
ROAD BUILDING
10-12-20
The road base of Snowdrift Dr is installed in front of the North pond down to lots 7-12
LOT GRADING
10-10-20
Thousands of yards of fill are hauled in, spread and graded on lots 1-3
LOT GRADING
10-9-20
Lots16-18 are leveled, compacted and brought to final grade
MOUNTAINS OF FILL
10-7-20
Some of the 50,000+ yards of clay fill awaits grading on lots 16-18
NORTH POND CONSTRUCTION
10-7-20
Construction on the North pond begins
SOUTH POND CONSTRUCTION
9-30-20
South Pond main excavation is completed and ready to install clay liner
SOUTH POND CONSTRUCTION
9-30-20
Bowers & Sons Construction team makes good headway digging the South Pond
STARTING SOUTH POND
9-29-20
Bowers & Sons Construction pumps surface water off and makes final preparations before digging the South pond
TRUCK PARADE
9-28-20
A parade of dump trucks works on French Rd hauling in 40,000+ yards of clay fill to raise the grade of Snowdrift Dr and the Southern most six lots of Broadway Hills Estates
STORM SEWER INSTALL
9-28-20
Storm sewer lateral installation in thick mud heading North on the East side of Lots 16-18.
STORM SEWER INSTALL
9-24-20
Storm sewer installation heading North on Snowdrift Dr in front of Lot #2. Trucks hauling fill in the background to raise level of the road and Southern six lots.
STORM SEWER INSTALL
9-23-20
Storm sewer installation on the South lot line of Lot #18 and Broadway Dr
WATER MAIN INSTALLED ON SNOWDRIFT DR
9-18-20
Water main and hydrants installed along Snowdrift Drive
NORTH POND AREA
9-17-20
View of the North pond. Top Soil has been stripped and ready for excavation around Oct 8th.
SOUTH POND AREA/LOT #19
9-17-20
View of the South pond and part of Lot #19. Top Soil has been stripped and ready for excavation around Oct 1st.
SNOWDRIFT DR
9-16-20
Snowdrift Drive has sanitary sewer installed, blue flags on the left (East) side of the road mark the water main to be installed over the next week
INSTALLING SANITARY SEWER
9-15-20
Bowers & Sons employees installing sanitary sewer in front of lot #9 & 13 in Snowdrift Dr, 27' below ground!